Need Help With This Assignment?

Let Our Team of Professional Writers Write a PLAGIARISM-FREE Paper for You!

Proof of Concept

Proof of Concept

Part 1: Gantt Chart

Gantt Chart

Gantt Chart

Part 2: Testing and User Acceptance Report

System and Stress Testing

One of the required testing processes that are conducted during the development of a project includes system testing. System testing involves the process of testing whether the whole system is capable of performing the intended functions. Different individuals can conduct the process of conducting system testing. These can include members of the team responsible for developing the system or professional testers who are noted to create better testing environments when compared to the individuals responsible for developing the system (Talby, Keren, Hazzan, & Dubinsky, 2006). Like system testing, stress testing is another type of testing that is required. Čihák (2007) includes the process of testing a system to determine how to system will behave when presented with adverse conditions. Stress testing is used to determine how stable and reliable a system will be, especially when the system is presented with adverse conditions. The industry leaders might require the system and stress tests to determine whether the developed system will be able to conduct all the intended functions or continue to function when presented with different challenges. The process of conducting system and stress testing can be improved by identifying the best test environments for conducting either of the tests. This is then followed by determining the criteria by which the system and stress tests will determine whether they were a success. The criteria for determining the success of the tests should also include the design of the tests. Get in touch with us at eminencepapers.com. We offer assignment help with high professionalism.

User Acceptance Testing

The industry leaders might also require user acceptance testing besides the system and stress tests. Unlike stress and system tests, user acceptance testing is not conducted by the individuals that develop the system or professional testers but by the end-users or the clients. User acceptance testing aims to determine whether the defined requirements for the end-users have been met (Hambling & Van Goethem, 2013). It also addresses the ease with which the users are able to use the system. Industry leaders might be interested in user acceptance testing due to its importance in determining the success of the system. When the users cannot use the system or find that some of the functionalities are not present, the system is likely to fail. However, the success of the system can be determined when the user acceptance testing is successful. One of the best practices when conducting user acceptance testing is ensuring that the end-users identified to conduct the testing process are representative of the target market that are likely to become the system’s end-users. An example of this for the XYZ Software Enterprise, having the employees of the restaurant conduct user acceptance testing can be essential in determining whether the users at the restaurant will be able to use the developed system effectively.

Part 3: Use Case Diagram

Case Diagram

Case Diagram

Part 4: Activity Diagram

Activity Diagram

Activity Diagram

References

Čihák, M. (2007). Introduction to applied stress testing. IMF Working Papers, 1-74.

Hambling, B., & Van Goethem, P. (2013). User acceptance testing: a step-by-step guide. BCS Learning & Development.

Talby, D., Keren, A., Hazzan, O., & Dubinsky, Y. (2006). Agile software testing in a large-scale project. IEEE Software, 23(4), 30-37.

ORDER A PLAGIARISM-FREE PAPER HERE

We’ll write everything from scratch

Question 


Technical Paper: Proof of Concept (POC)

Your company is a 4-year-old startup called XYZ Software Enterprises. XYZ produces a point of sale system and was awarded a Proof of Concept (POC) to one of the largest and oldest restaurants in the industry (you know, the ones in the commercials all the time). The restaurant wants XYZ to prove that the software will do what the sales people said it could do.

Your Proof of Concept will include four parts:

Proof of Concept

Proof of Concept

  • Part 1: Gantt Chart
  • Part 2: Testing and User Acceptance Report
  • Part 3: Use Case Diagram
  • Part 4: Activity Diagram

Part 1: Gantt Chart

A Gantt Chart (see page 353 Figure 11-18) needs to be created for the entire process of the Proof of Concept. There is a two-month deadline from today to complete the POC.

Using Visio or Excel, create a Gantt Chart that includes all of the items listed below and adds five more tasks minimum from the concepts learned from the course:

  • The initial meeting — today.
  • Should appear as the first line.
  • Teams selected to participate in the project (1 week).
  • Information gathering (add the information gathering methods you will use and how long each will take).
  • System configurations based on information gathering methods (2 weeks).
  • Create Activity Chart based on information gathering (info to create chart supplied).
  • Create Use Case Diagram based on information gathering (info to create chart supplied).
  • Show the finished configurations to the team and get feedback (1 day).
  • Make changes based on feedback (3 days).
  • Install the system in the test store (2 days).
  • Train staff (1 day).
  • Run a live test of POC (2 weeks).

NOTE:

  • The five or more additional tasks can be subtasks for information gathering methods as well some other subtask or major task not in the initial list.
  • You may add items from the SDLC, specific item(s) on testing, or any other concept you think should be part of the POC process learned in the course of this semester.

NOTE: Remember that events in a Gantt chart can happen at the same time as other events. Some items also cannot start until others are completed. Everything has an estimated timeframe and it is displayed in the chart.

Part 2: Testing and User Acceptance Report

As part of the expected documentation in the POC, XYZ wants a report on Testing and User Acceptance.

Your manager is asking you to research the testing criteria they listed in the POC documents.

The POC document states that they are looking for:

  1. System and Stress Testing
  2. User Acceptance Testing (UAT)

For both categories, research and report on:

  1. What these tests are.
  2. Why the industry leader would want these particular tests.
  3. The best ways, in detail, to accomplish the tests so that your company meets the criteria they are looking for.
    • These items can be added to your Gantt Chart (Part 1)

Part 3: Use Case Diagram

The restaurant, as part of the information gathering, outlined a use case in a chart (below).

Your manager assigned you to create the Use Case Diagram using Visio, MS Word, or any other software. (See the diagrams on Page 84 and 85 of the textbook.)

  • Paste the diagram into the created report.
USE CASE ACTOR
Order Food Waiter, Patron, Chef
Serve Food Waiter
Cook Food Chef
Pay for food Waiter, Patron
Eat Food Patron

Part 4: Activity Diagram

As a part of the information gathering process, a chart of items was provided by XYZ.

Your manager has asked that you use Visio, MS Word, or any other software with which you are familiar to create the Activity Diagram (see pages 138 Figure 5-5 and 139 Figure 5-6 in the textbook.)

  • Paste the diagram into the created report.
POS SALES PROCESS
Activity Diagram
Host/Hostess seats patron
Server takes drink order
Server opens order for table in POS system
Server places drink order in the POS system
System sends drink order to the Bar
Bar makes drinks
Server brings drinks to table
Server takes food order
Server adds food order in the POS system
Order goes to kitchen
Chef and staff cook the order
Food Runner brings food to table
Server takes dessert order
Server adds dessert order to POS
Chef and Staff create desserts
Food Runner brings desserts to table
Server creates check in POS
Server collects payment and enters it in POS
Server adds tipped amount to POS
Server closes table in POS

Additionally you must:

  • Use at least 3 quality resources. NOTE: Wikipedia and similar websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

  • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
  • Include a cover page containing the title of the assignment, your name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
  • Include charts or diagrams created in Visio, Word, or an open source alternative. The completed diagrams/charts must be imported into the Word document before the paper is submitted.